The Transportation Improvement Program (TIP) is the five-year federal and state funding program for transportation projects covering all modes of travel in Palm Beach County.
The TIP is consistent with the FDOT work program and is developed through a continuing, cooperative, comprehensive and coordinated effort involving FDOT, the Palm Beach County Board of County Commissioners, the Port of Palm Beach, the South Florida Regional Transportation Authority and municipalities within the County.
Draft FY 2027-2031 Transportation Improvement Program
FY 2027-2031 Draft TIP Full Document (PDF) – Scheduled for Adoption June 18, 2026.
FY 2027-2031 TIP Executive Summary (PDF)
Districtwide Projects (PDF) – District 4
Locally Funded Projects (PDF) – informational
- Appendix A – Glossary (PDF)
- Appendix B – Public Participation and Comments (PDF)
- Appendix C – Federal Performance Measures (PDF)
- Appendix D – MPO Priority Projects for FY 27-31 (PDF)
- Appendix E – Draft Tentative Work Program for FY 27-31
- Appendix F – Eastern Federal Lands Highway Division FY 26-29 TIP (PDF)
- Appendix G – Annual Listing of Obligated Projects – FY 2025
- Appendix H – TIP Amendments and Modifications – as needed
Draft FY 2027-2031 TIP Public Comment Form
FY 2026 – 2030 Transportation Improvement Program
TIP Review Tool
FY 2026-2030 TIP Full Document (PDF) Amended September 18, 2025.
FY 2026-2030 TIP Executive Summary (PDF)
Districtwide Projects (PDF) – District 4
Locally Funded Projects (PDF) – informational
Appendices
- Appendix A – Glossary (PDF)
- Appendix B – Public Participation and Comments (PDF)
- Appendix C – Federal Performance Measures (PDF)
- Appendix D – MPO Priority Projects for FY 26-30 (PDF)
- Appendix E – Draft Tentative Work Program for FY 26-30 (PDF)
- Appendix F – Eastern Federal Lands Highway Division FY 23-26 TIP -Midyear (PDF)
- Appendix G – Annual Listing of Obligated Projects – FY 2025
- Appendix H – TIP Amendments and Modifications – as needed
- FY 2026-2030 TIP Amendment 1 Packet (PDF) – Adopted 9/18/2025
- FY 2026-2030 TIP Amendment 2 Summary with Resolution (PDF) – Adopted 12/11/2025
- FY 2026-2030 TIP Amendment 3 Summary (PDF) – Scheduled for Adoption June 18, 2026.
The TIP starts with the MPO’s annual adoption of a List of Priority Projects. The list is shared with FDOT to be considered in the development of a Draft Work Program. FDOT presents the Work Program to the MPO “to determine the necessity of making any changes to projects included or to be included in the District Work Program and to hear requests for new projects to be added to, or existing projects to be deleted from, the District Work Program.” The FY 2026-2030 Work Program was endorsed by the MPO Governing Board on December 12, 2024.
- MPO DTWP Summary (PDF)
- Florida Turnpike Summary (PDF)